The Lee Greenley Jr. Memorial Research Center, near Novelty, MO, is the site of the MU Drainage and Subirrigation (MUDS) Plot 2. This research site has been established to evaluate undrained, conventional drainage, and controlled drainage practices. Each of the applied practices are separated by a plastic liner to and 8” berms to prevent water movement between practice types. Management of the water control structures has typically started 2 months after planting and remained in place until the following spring.